Approach
An established process without inflated claims.
CiviTech controls the sequence from a confidential initial requirement to an operable asset. Each gate makes responsibilities, unknowns and evidence visible before the client commits further.
- A
Brief accepted
Decision authority, information rules, scenarios, occupants, operations, assets, exclusions and assumptions are recorded.
- B
Feasibility accepted
Site information, options, interfaces, client-provided permit constraints, initial cost, programme and specialist investigations are understood.
- C
Requirements frozen
Measurable criteria, responsibilities, standards, test methods, change control, cost and programme are aligned.
- D
Ready to construct
Coordinated information, contractor controls, long-lead items and evidence requirements are in place, and the client confirms that all required permits have been secured.
- E
Ready to operate
Inspections, tests, deviations, manuals, training, ownership, maintenance and retesting responsibilities are complete.
CiviTech leads
The coordination line.
- Requirements and stakeholder workshops
- Responsibility, interface and decision control
- Specialist appointment strategy
- Programme, cost and risk coordination
- Client-side delivery reporting
- Testing and handover coordination
Client and specialists retain
Professional and statutory responsibility.
- Client-led authority procedures, approvals and permits
- Regulated calculations and design
- Project-specific protection criteria
- Professional signatures and regulated submissions
- Construction means and methods
- Tests, certificates and operational authority
Commercial route
Clear stages and funded appointments.
Feasibility is commissioned first. Follow-on design and delivery coordination is proposed after the scope, specialist team and client-provided permit constraints are known.
Initial consultation
Up to 45 minutes, no fee.
Initial mandate
Defined feasibility deliverables and fixed commercial basis.
Project delivery
Separate appointment aligned with specialist and delivery scopes.
Scope note:
Feasibility outputs are non-binding and do not constitute execution design, a construction quotation, statutory approval or a guarantee of protective performance. CiviTech does not manage authority procedures, approvals or construction permits.