Capacity-led accommodation
Seating, sleeping, hygiene and storage are derived from approved occupancy rather than a generic room size.
Illustrative concept 02
A developer or residential operator wants one shared protected area for two apartment buildings. It must accommodate the nominated residents, remain discreet and be manageable after handover.

Client requirement
Decisions
Proposed concept
Seating, sleeping, hygiene and storage are derived from approved occupancy rather than a generic room size.
Access and priority rules account for children, older residents and people with limited mobility.
Essential services are sized from the approved occupancy and protected-operation target.
Inspection, testing, training, replacement and service-charge responsibilities are assigned before handover.
Deliverable
The mandate creates a decision-ready basis for specialist design and project delivery.
Initial Mandate / Feasibility Study
The final proposal reflects size, location, available information, specialist input, confidentiality requirements and required outputs.
| Integrated into a planned development | From CHF 25'000.- |
|---|---|
| Connected to an existing development | From CHF 35'000.- |
| Standalone shared structure | From CHF 32'500.- |
Scope note:
Capacity, protection performance and required equipment depend on the local legal framework and agreed operating brief. The study prices only the shared protected scope and its interfaces, not the apartment buildings.
Evidence